After the pipe is inspected, the trench is filled in. Before completing the project, the pipeline integrity must be verified using sondnesstesting.
Pressure tests are performed to ensure the safety, reliability, and leak tightness of pressure systems. A pressure test is required for a new pressure system before use or an existing pressure system after repair or alteration