The trench for the pipeline is dug after the ROW is cleared. The trenching crew moves in to dig the trench that holds the pipeline. The crew must create a trench deep enough to accommodate the pipeline, plus the required distance from the pipeline to the ground surface. Certain areas, such as waterways and road crossings, require a greater minimum depth to meet the regulations for the pipelines.