The most widely used method for joining individual lengths of PE pipe and pipe to PE fittings is by heat fusion of the pipe butt ends. This technique produces a permanent, economical and flow-efficient connection. Quality butt fusion joints are produced by using trained operators and quality butt fusion machines in good condition.
Author Archives: admin
This technique of heat fusion joining is different from the conventional fusion joining method. The main difference between conventional heat fusion and electrofusionis the method by which the heat is applied. In conventional heat fusion joining, a heating tool is used to heat the pipe and fitting surfaces. The electrofusionjoint is heated internally, either by..
After the pipe is inspected, the trench is filled in. Before completing the project, the pipeline integrity must be verified using sondnesstesting. Pressure tests are performed to ensure the safety, reliability, and leak tightness of pressure systems. A pressure test is required for a new pressure system before use or an existing pressure system after..
“Pigs” are inserted into the pipe to clean it out. When the pigs eventuallyexit the far end of the pipe clean, then the line will be filled with dry air. Air compressors pump up the air, and the air is run thru a drier. A pig may discharge from the pipeline with considerable velocity and..
In order to construct a pipeline, staging areas and storage yards are cleared, strategically located along the planned right-of-way. They provide parking for construction equipment, employee trucks, and locations for office trailers.Both materials and equipments are transferred from our store to the worksite.
The survey crew also marks the center-line of the trench as a guide for digging. Road-cutter provides a clean edge through the material without transmitting cracks or damage further into the structure.Asphalt Pavement to be removed shall be neatly saw cut full depth along straight lines. Only such pavement shall be removed as is necessary..
The trench for the pipeline is dug after the ROW is cleared. The trenching crew moves in to dig the trench that holds the pipeline. The crew must create a trench deep enough to accommodate the pipeline, plus the required distance from the pipeline to the ground surface. Certain areas, such as waterways and road..
Pipes are laid above ground beside the trench, or within the trench on top of supportive sandbags in steep terrain. “Stringing” is the method by which pipeline construction workers assemble the pieces prior to completing the “puzzle,” making sure everything is accounted for. Every length of pipe is marked to indicate where it belongs along..